Project Solutions
Airports HVAC Supply Package
High-volume terminal HVAC and smoke control systems for aviation facilities.
The Challenge
Airport terminals combine very high occupant-density conditioning loads with strict life-safety smoke control and evacuation requirements, under continuous 24/7 operational constraints.
Our Approach
High-capacity AHUs and centrifugal ventilation pair with HT300°C-rated smoke extraction fans and fire/smoke dampers, engineered around your facility's phased construction schedule.
Typical Scope
- High-capacity AHUs
- Smoke extraction fans (HT300°C/2h)
- Fire & smoke dampers
- Terminal-zone VAV distribution
Relevant Product Categories
Other Project Types
